View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Road Closure-Wallace St 10/29/18 to 5/24/19 for Loeb Stadium watermain installation

    October 29, 2018, 7:00 AM - May 24, 2019, 5:00 PM

    Bowen Engineering will have Wallace Ave. and 24th St. shut down from 10/29/18 to 5/24/19. The intersection of Brice St. and 24th St. will be shut down for the majority of the project. There will be approx. a 3-4 week period when Brice St. between 24th St. and Park Ave. will be shut down to all traffic. Watch for lots of heavy equipment. Watch for Directional Signage, Detour signage, Road Closed signage, barricades, barrels and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  3. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  4. Temporary Lane Closures North lane of South St between 5th & 6th St 3/25 - 5/6

    March 25, 2019, 9:00 AM - May 6, 2019, 4:00 PM

    Star City Crossing LLC will be having temporary lane closures 3/25/19 to 5/6/19 on the North lane of South Street between 5th Street and 6th Street for material off loading. This will be 30 - 45 minute lane closures, 4-6 times per week between the hours of 9am - 4pm. Watch for traffic control signs and flaggers. Cpontact: Jon Caron 765-414-3995

    More Details
  5. Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/30

    April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM

    Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181

    More Details
  6. Road Closure-N. 4th St. @ North St. for road reconstruction 4/17 - 5/1

    April 17, 2019, 7:00 AM - May 1, 2019, 5:00 PM

    Case Construction will have N. 4th Street closed at North Street along with the block between N. 4th Street and N. 5th Street for road reconstruction, curb ramps and sidewalks from 4/17/19 to 5/1/19. Watch for road closed signs, detour signs and traffic control devices. Contact: Mike Rominger 765-656-4612

    More Details
  7. Lane Closure North lane of Union St between 12th & 13th St 4/18-5/18 working on apt. bldg.

    April 18, 2019, 7:00 AM - May 18, 2019, 5:00 PM

    Keller Development will have the North Lane of Union Street between 12th Street and 13th Street from 4/18/19 to 5/18/19 to work on the front of apartment building that is being constructed (Union Place Apts.) Watch for arrow board, signs and barrels. North lane will taper into the South lane between 12th Street and 13th Street. Contact: Mark Snyder 260-348-1976

    More Details
  8. Parking Restriction/Sidewalk Closed on West side of Tipp. Co. Courthouse 4/19-4/26 to work on stairs

    April 19, 2019, 7:00 AM - April 26, 2019, 5:00 PM

    Dixon Construction will have parking restrictions and sidewalk closure on the West side of the Tippecanoe County Courthouse along 3rd Street between Main Street and Columbia Street 4/19/19 to 4/26/19 to work on steps. Watch for barrels and sidewalk closed signs. Contact: Tommy Dixon 765-409-3489

    More Details
  9. Lane Restriction @ 3601 Union St Eastbound lane closest to shoulder 4/22-5/17 for installation of curb

    April 22, 2019, 7:00 AM - May 17, 2019, 5:00 PM

    RW Contracting will have a temporary lane restriction at 3601 Union Street from 4/22/19 to 5/17/19 for installation of curb and sidewalk. This will be along the South shoulder of the Eastbound lane. Watch for signage and barrels. There will be sidewalk closed signs at Union Street and Shenandoah Drive, also at Union Street and 36th Street. Contact: Matthew Miller 765-499-9390

    More Details
  10. Lane Closure-South side of Albany St between N. 20th St & N. 21st St 4/23-5-3 working on damaged cable

    April 23, 2019, 7:00 AM - May 3, 2019, 5:00 PM

    Frontier Communications will be closing the South side of Albany Street between N. 20th Street and N. 21st Street to repair damaged cable under roadway. Watch for traffic control devices. This will be 4/23/19 to 5/3/19. Contact: Mike Boebinger 765-423-3288.

    More Details
  11. Lane Restriction-Union St Right Ln of Eastbound between 30th & Earl 4/26 from 7am-1pm

    April 26, 2019, 7:00 AM - 1:00 PM

    Aegion will have a temporary lane restriction on Union Street on the right lane of the Eastbound traffic between N. 30th Street and Earl Avenue working on sanitary sewer line on N. 31st Street. This will be from 7:00 AM to 1:00 PM. Watch for arrow board and barrels and flaggers. Contact: Nick Rosner 517-294-4400

    More Details
  12. Lane Restriction Rt. lane of Southbound Earl @ South St & Rt. lane of Westbound South St East of Earl 4/26, 8-11am

    April 26, 2019, 8:00 AM - 11:00 AM

    Aegion will have temporary lane restrictions on right lane of Southbound traffic on Earl Ave. at South Street and right lane of Westbound traffic on South Street just East of Earl Ave. cleaning and televising sanitary sewer. This will be 4/26/19 from 8:00 AM to 11:00 AM. Watch for arrow board and barrels. Contact: Nick Rosner 517-294-4400

    More Details