Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

City Council

  1. City Council Caucus Meeting

    March 27, 2019, 6:30 PM - 7:30 PM @ Board of Works Room

    More Details

Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Road Closure-Wallace St 10/29/18 to 5/24/19 for Loeb Stadium watermain installation

    October 29, 2018, 7:00 AM - May 24, 2019, 5:00 PM

    Bowen Engineering will have Wallace Ave. and 24th St. shut down from 10/29/18 to 5/24/19. The intersection of Brice St. and 24th St. will be shut down for the majority of the project. There will be approx. a 3-4 week period when Brice St. between 24th St. and Park Ave. will be shut down to all traffic. Watch for lots of heavy equipment. Watch for Directional Signage, Detour signage, Road Closed signage, barricades, barrels and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  3. Road Closure on Chisholm Tr between Strawhat Dr & Wagon Wheel Tr 3/4 to 3/29

    March 4, 2019, 7:00 AM - March 29, 2019, 5:00 PM

    Bowen Engineering will have a Road Closure on Chisholm Trail between Strawhat Drive and N. Wagon Wheel Trail from 3/4/19 to 3/29/19 between 7 am and 5 pm for sanitary sewer replacement. Watch for traffic control signage and barricades. Contact: Nick Isenhower 317-518-9721

    More Details
  4. Lane Closure on Meijer Ct. 185' W. of Meijer Dr. 3/18 - 3/29 installation of storm pipe.

    March 18, 2019, 7:00 AM - March 29, 2019, 5:00 PM

    Atlas Excavating will be working on the installation of new storm pipe 3/18/19 to 3/29/19. Contractor will keep half the roadway open at a time to allow cars to pass through the area. Watch for traffic control signs, traffic barrels, barricades and flaggers. Contact: Bret Dierdorf 812-243-2115

    More Details
  5. Lane Restrictions Northbound & Southbound on US 52 from VMP South to CR 775 E. 3/18 -4/12

    March 18, 2019, 7:00 AM - April 12, 2019, 5:00 PM

    Rieth-Riley will have lane restrictions on the Northbound and Southbound lanes on US 52 from Veterans Memorial Pkwy. to CR 775 E. for asphalt rehabilitation. Areas with most impact to travel will be delays at Veterans Memorial Pkwy. and CR 450 E. intersections. EXPECT DELAYS. 24 hour lane restrictions should be expected. Watch for arrow boards, barrels and other traffic control devices. Contact: J.R. Beaman 765-404-4750

    More Details
  6. Daily lane restrictions @ Ross Rd & US 52 Southbound passing lane for turn lane const. 3/25 - 4/4 between 7am - 6pm

    March 25, 2019, 7:00 AM - April 4, 2019, 5:00 PM

    Rieth-Riley will have daily lane restrictions 3/25/19 to 4/4/19 in Southbound passing lane (US 52 East) at the intersection of Ross Road and US 52. This lane restriction will be approximately 1,500 ft. long. Crews will be working on the inside median. There will be advanced warning signs, arrow board and MOT devices in place. Note: this will be going on at the same time as the work that is currently under construction from Veterans Memorial Parkway to CR 800 S. Contact: JR Beaman 765-404-4750

    More Details
  7. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  8. Temporary Lane Closures North lane of South St between 5th & 6th St 3/25 - 5/6

    March 25, 2019, 9:00 AM - May 6, 2019, 4:00 PM

    Star City Crossing LLC will be having temporary lane closures 3/25/19 to 5/6/19 on the North lane of South Street between 5th Street and 6th Street for material off loading. This will be 30 - 45 minute lane closures, 4-6 times per week between the hours of 9am - 4pm. Watch for traffic control signs and flaggers. Cpontact: Jon Caron 765-414-3995

    More Details