Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Boards & Commissions

  1. Board of Public Works Caucus Meeting

    March 19, 2019, 8:30 AM - 9:00 AM @ Board of Works Room

    More Details
  2. Board of Public Works Meeting

    March 19, 2019, 9:00 AM - 9:30 AM @ Common Council Chamber

    More Details

Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Road Closure-Wallace St 10/29/18 to 5/24/19 for Loeb Stadium watermain installation

    October 29, 2018, 7:00 AM - May 24, 2019, 5:00 PM

    Bowen Engineering will have Wallace Ave. and 24th St. shut down from 10/29/18 to 5/24/19. The intersection of Brice St. and 24th St. will be shut down for the majority of the project. There will be approx. a 3-4 week period when Brice St. between 24th St. and Park Ave. will be shut down to all traffic. Watch for lots of heavy equipment. Watch for Directional Signage, Detour signage, Road Closed signage, barricades, barrels and flaggers. Contact: Nick Isenhower 317-518-9721

    More Details
  3. Road Closure on Chisholm Tr between Strawhat Dr & Wagon Wheel Tr 3/4 to 3/29

    March 4, 2019, 7:00 AM - March 29, 2019, 5:00 PM

    Bowen Engineering will have a Road Closure on Chisholm Trail between Strawhat Drive and N. Wagon Wheel Trail from 3/4/19 to 3/29/19 between 7 am and 5 pm for sanitary sewer replacement. Watch for traffic control signage and barricades. Contact: Nick Isenhower 317-518-9721

    More Details
  4. Lane Closure on Meijer Ct. 185' W. of Meijer Dr. 3/18 - 3/29 installation of storm pipe.

    March 18, 2019, 7:00 AM - March 29, 2019, 5:00 PM

    Atlas Excavating will be working on the installation of new storm pipe 3/18/19 to 3/29/19. Contractor will keep half the roadway open at a time to allow cars to pass through the area. Watch for traffic control signs, traffic barrels, barricades and flaggers. Contact: Bret Dierdorf 812-243-2115

    More Details
  5. Lane Restrictions Northbound & Southbound on US 52 from VMP South to CR 775 E. 3/18 -4/12

    March 18, 2019, 7:00 AM - April 12, 2019, 5:00 PM

    Rieth-Riley will have lane restrictions on the Northbound and Southbound lanes on US 52 from Veterans Memorial Pkwy. to CR 775 E. for asphalt rehabilitation. Areas with most impact to travel will be delays at Veterans Memorial Pkwy. and CR 450 E. intersections. EXPECT DELAYS. 24 hour lane restrictions should be expected. Watch for arrow boards, barrels and other traffic control devices. Contact: J.R. Beaman 765-404-4750

    More Details