Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Engineering & Public Works

  1. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  2. Traffic pattern change on US 52 beginning 8/31/18 between CR 400 S & CR 800 S

    August 31, 2018, 7:00 AM - October 31, 2018, 5:00 PM

    Rieth-Riley will be changing the traffic pattern on US 52 from 8/31/18 to 10/31/18. Moving Eastbound lane into the original drive lane. Westbound driving lane will be moving through the crossovers into the Eastbound passing lane while maintaining two-way traffic. This change will take place between CR 400 S. and CR 800 S. Contact: J. R. Beaman 765-404-4750

    More Details
  3. Main Street Closure -

    September 17, 2018, 12:15 PM - October 26, 2018

    Beginning monday September 17th the City will be closing Main Street to through traffic in between Kossuth Street and Perdue Street. construction work will be taking place at the intersection of 21st Street and Main Street and where Wallace Street and Congress Street intersect Main Street. There will be hard barricades at the following intersections, Perdue and Main, Wallace and Main, and 21st and Main, no traffic will be allowed past those points. This closure will be until approximately October 26th, 2018. The detour will be Kossuth Street, South 18th Street and Perdue Street.

    More Details
  4. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  5. Lane Restrictions on Hart St from 16th to 17th & Perrine St from 17th to 18th 10/15 to 11/21

    October 15, 2018, 7:00 AM - November 21, 2018, 5:00 PM

    Dixon Construction will have lane restrictions on Hart St. between N. 16th St. and N. 17th St. as well as Perrine St. between N. 17th St. and N. 18th St. 10/15/18 to 11/21/18 for the replacement of concrete sidewalk, ADA ramps, driveway approaches and curb and gutter. Prior to construction there will be tree removal that may constitute entire road closures for a brief time. There will be barrels with 'No Parking' signs along edge of roadway. Contact: Tom Dixon 765-426-3501 or Tommy Dixon 765-409-3489

    More Details
  6. Alley Closure-West side of City Hall from Columbia to South St. 10/16 - 12/15

    October 16, 2018, 7:00 AM - December 15, 2018, 5:00 PM

    Star City Crossing will have the Alley Closed on the West side of City Hall for the construction of a new building. This closure will be from 10/16/18 to 12/15/18. There will be Barricades with flashing lights and signage 'Road Closed' placed at entrance to alley. Contact: Jon Caron 765-414-3995

    More Details
  7. Road Closure-21st St from Main to Congress St 10/16 to 10/30 for Loeb Stadium watermain

    October 16, 2018, 7:00 AM - October 30, 2018, 5:00 PM

    Bowen Engineering will have a Road Closure on 21st Street between Main Street and Congress Street. Also Congress Street from 21st Street to Main Street. All sidewalks along these roadways will be closed with signs indicating so. Closure will be from 10/16/18 to 10/30/18. Barricades will be set up at each intersection showing the road to be closed. Contact: Nicholas Isenhower 317-518-9721

    More Details
  8. Road Closed to through traffic on Perrine St from 17th to 18th St 10/18-10/19 tree removal

    October 18, 2018, 7:00 AM - October 19, 2018, 5:00 PM

    Dixon Construction will be having 'Road Closure to Through Traffic' for tree removal,grinding and clean up on Perrine Street between N. 17th Street and N. 18th Street. This will be 10/18/18 to 10/19/18. Local residence will have access. Contact: Tommy Dixon 765-409-3489 or Tom Dixon 765-426-3501

    More Details
  9. Lane Restriction-N. 4th St between Columbia & South St 10/18 from 9-10AM Installation of HVAC roof unit

    October 18, 2018, 9:00 AM - 10:00 AM

    Blue Fox Heating and Cooling will have a Lane Restriction and Parking Spaces Closed along the West side of N. 4th Street between Columbia Street and South Street on 10/18/18 from 9 AM to 10 AM to install a new HVAC roof unit. Watch for traffic control and flaggers. Contact: J. D, Disher 765-491-4144

    More Details